| Search |
| About Us |
| Welcome |
| Company |
| Customers |
| Partners |
| Careers |
| Products |
| Satellite Monitoring |
| RF Monitoring |
| Digital Television |
| Automated Test |
| Process Management |
| Business Continuity |
| Research |
| Research Activities |
| EU FP |
| ESA |
| National Programmes |
| » ACERCA-T |
| » ATLANTIDA |
| » DVB-H-LAB |
| » ELISA |
| » HADA-TDT |
| » VISAT |
| News |
| Events |
| Press Releases |
| More |
| Technical Notes |

Start: January 2006
End: October 2007
Homepage:
http://www.integrasys-sa.com/projects.php?type=national&name=VISAT
The VISAT project was focused on via-satellite broadband services based on DVB-RCS, including sub-optimal terminal elements (prone to service degradation), which are appropriate due to its low cost to offer services at reasonable price to a wide user community.
The project was presented in the "cooperation" mode, proposed by INTEGRASYS S.A. as coordinator and HISPASAT S.A. as participant, guided by the existing need to extend current knowledge and concepts in network management.
The project takes as starting point a preliminar approach that combines (applying correlation techniques) the existing knowledge in different control center systems with spectrum monitoring and measurement techniques to determine the status of interactive terminals and recover out-of-service or degraded terminals.
The strategic objectives targeted by the VISAT project are the following:
During the project lifetime the following milestones and deliverables were defined:
Milestone 1: Specification of new network management procedures and techniques
The first work package coordinated by INTEGRASYS, but under the responsibility of HISPASAT, consisted on the formal specification of the work to perform, establishing the technical objectives and the features that the final product must meet, the procedures to automate, the knowledge to acquire and the new techniques to develop with the aim to automate the management and control of the via-satellite broadband platform.
As it was formerly comented, the task schedulle in this initial phase included multiple brainstorming meetings to foster acquisition of new ideas, knowledge and experiences of the staff involved in manual service management and control operations, with the aim to further determining optimal procedures that could be later generalised and implemented.
Milestone 2: Analysis and Design Phase, logic of the new automatic procedures.
The second work package started in April 2006 and ended in December 2006.
This work package, under the responsibility of INTEGRASYS, involved analysing and designing the logic for the new procedures, taking as imput the functional specifications of the previous phase, together with the capacities of the different technologies, systems and tools to use in the development to specify the functional design of the new application.
As a result of the new phase, the document D01: "Functional System Design" was produced, including the general system design and the particular design for each procedure, module and component, establishing the foundations for its subsequent software implementation.
Milestone 5: Project Management and Patent application
Project management tasks, under INTEGRASYS responsibility, aimed an efficient and economic project control, with the required reactive capacity to tackle any incident affecting project course.
INTEGRASYS and HISPASAT are collaborating in project result dissemination to other network operators, service providers and RCST equipment manufacturers, following two approaches:
The materials produced for these activities have been:
Funded by the Spanish Ministry of Industry, Tourism and Commerce under the National Plan for Scientific Research, Development and Technological Innovation (1/2006).